Suzhou PLC Control Cabinet Manufacturer

Xingyuan Electric (Suzhou) Wujiang plant | 30+ staff | 3,000 sqm in-house line | PLC / automation control panels

Six reasons to choose Xingyuan Electric for plc control cabinets

Xingyuan Electric (Suzhou) Co., Ltd. runs its own base in Wujiang, Suzhou. As a PLC control cabinet manufacturer we build PLC panels, automation control cabinets and assembled control panels for machinery and production lines, fitting mainstream PLC, VFD and HMI brands such as Siemens, Mitsubishi and Omron, wired and tested to the electrical schematic.

30+ staff

In-house production and engineering team: sheet-metal workers, welders, assemblers, QC and engineering support

3000㎡

Combined area of two self-owned production bases — not rented stalls or assembly workshops

20+ machines

Fiber laser cutters, CNC press brakes, laser welders, aluminum welders, tapping and riveting machines, etc.

±0.1mm

Laser cutting and bending tolerance control; profile frame flatness is inspected

7–15 days

Typical batch lead time; production is scheduled after sample approval

ISO 9001

Quality management system certified, RoHS compliant, inspection records available

PLC control cabinets types we build

As a sheet metal cabinet manufacturer, all products below are made in our own workshop; non-standard sizes available from drawings or samples.

Standard PLC Cabinet

Single/double-door PLC cabinet with PLC, PSU, relays and terminal blocks.

Automation Control Cabinet

Centralized line control cabinet integrating IO, drives and comms.

VFD Control Cabinet

PLC plus VFD motor control with braking and protection.

Non-standard Cabinet

Custom-shaped or off-size cabinets per equipment layout.

Robot Control Cabinet

Control cabinet and wiring structure for industrial robots.

Made-to-Print Panel

Wired and tested PLC cabinets from customer electrical drawings.

In-house production line: complete process from sheet metal to finished cabinet

As a Suzhou cabinet manufacturer, all six processes below are completed in our own workshop — nothing is outsourced.

01

Fiber laser cutting

1.5kW fiber laser cutting leaves clean edges without re-grinding; precision meets the fitting requirements of panels, side plates and rear plates.

02

CNC bending

CNC press brakes with dedicated tooling control bend angle and springback, ensuring flatness and consistent gaps after assembly.

03

Laser & argon-arc welding

Corners and reinforcements are laser or argon-arc welded; smooth seams leave no visible bumps after coating and do not affect locks or hinges.

04

Profile frame assembly

9-fold and 16-fold profile frames are built to standard sizes and rail spacing, compatible with standard rails, fans, thermal control and PDUs.

05

Surface treatment

Steel sheets are degreased, phosphated and powder-coated; adhesion and thickness are sampled per batch; stainless parts are brushed or passivated.

06

Assembly & inspection

After locks, hinges and gaskets are installed, every unit is inspected for operation, sealing and interfaces; inspection records ship with each order.

How to judge a professional plc control cabinets manufacturer

When vetting a supplier, verify the following on site — all of them can be seen at our Wujiang factory.

Brand fit

Confirm the supplier fits your specified PLC/VFD/HMI brands and models.

Wiring craft

Wire numbers, terminals, trays and earthing must be standard.

Cooling and rating

Heat and dust/moisture decide ventilation and enclosure rating.

Layout and service

Component layout should ease wiring, commissioning and replacement.

Test and docs

Ship with wiring check, insulation test and drawing consistency.

PLC control cabinets FAQ

Do you fit Siemens/Mitsubishi/Omron PLCs?

Yes. We fit specified PLC, VFD and HMI brands and models and wire to print.

Can PLC cabinets integrate VFD and HMI?

Yes. PLC, VFD, HMI and IO are integrated per the control requirement.

Do you support non-standard sizes?

Yes. Off-size, shaped or split cabinets are customized to equipment layout.

What is included in assembled delivery?

Enclosure, component assembly, wiring to print, checks and test records.

What is the typical lead time?

Usually 7-15 days; print orders quote after drawing and BOM confirmation.

Related cabinet types

Xingyuan Electric covers a wide range of cabinets and sheet-metal enclosures; click to view each topic page.

Sheet metal cabinets

Visit the sheet metal cabinet topic page for features, processes and selection tips.

Special gas cabinets

Visit the special gas cabinet topic page for features, processes and selection tips.

Server cabinets

Visit the server cabinet topic page for features, processes and selection tips.

9-fold profile network cabinets

Visit the 9-fold profile network cabinet topic page for features, processes and selection tips.

Visit our factory

Factory address

Building C, No. 169 Longjing Road, Lili Town, Wujiang District, Suzhou, Jiangsu, China

Phone

+86 152 2123 4007 (WeChat same)

Service area

Suzhou, Kunshan, Wujiang, Shanghai, Wuxi, Changzhou, Nantong and the Yangtze Delta; nationwide shipping available

How to start

Call us with your drawings and specs; sample visits and quotations can be arranged;Leave a message online